Grid
-
The Two-Second Rule: How the Grid Became an Interface Spec
The OCP grid disturbance spec says compute load has to return to 90% of pre-fault power within two seconds of voltage coming back into band. It is the first spec in this series that constrains behavior instead of dimensions, and FERC is drafting the same rule with teeth.